We had to make sure we were keeping track of the steps we took so by creating a table including specific times and dates it allowed for us to be able to keep a record of when we done what which was useful as we needed to keep a record of what we was doing and when we was doing things so it could all be organised as all we would have to do at this stage is to follow these guidelines in order to achieve our thriller by following the steps we have placed in front of us as a path.

Date
Length
Reason
7th November 2012
2 hours
Going through the whole story so that the actors know what they are doing and then we know where the cameras should go and we also tested lighting.
8th November 2012
3 hours
We filmed the first 2 pages of our storyboard and we had many attempts but got what we wanted in the end. We had some trouble thinking about how we would make the reflection without seeing the camera but we got sorted that out
14th November 2012
3 hours
We filmed pages 3 and 4 and we completed it very easily. We are very happy about the footage we got.
15th November 2012
3-4 hours
We filmed the last 2 pages of the storyboard.
21st November 2012
30 mins
We filmed started filming the outside scenes but it got to dark so we had to wait for our next meeting.
22nd November 2012
1 hour
We filmed all outside footage and any other footage that needed re-doing.


Week one
Met to discuss narrative and possible location me, Arthur, Orçun. Talked about potable camera shots while thinking of the conventions. Decided on location and date to start filming.


Week two
Met a day before filming to arrange the Mise en scene to save time next day. Me, Sam. Arthur and Orçun discussed editing techniques we could use. Started filming.


Week three
Relocated the thriller as felt could be better. This delayed things as we had to edit the narrative and shots used. Thought additional actress was needed so started looking. We all changed ideas about costume so Arthur and Orçun searched for a mask.


Week four
Got mask and other actress, started filming. All were their. Didn't get a lot done but finalised the camera shots for the first 3rd of the production. Filmed first scene, came up with idea for dream.


Week five
Half way through film now, Sam unavailable so just us four. Deadline is closing and we're a bit behind time. Filming slows as disagreement over shots in the kitchen.


Week six
Thriller filmed but not edited. Behind time and rushing to complete by the deadline. All working to Finnish In time. I organised pictures I took of us working over the whole time ready for my presentation on it all.

1 comment:

  1. You have made a start in describing why meetings are important to carry out and you have also included an outline of what you and your group discussed. However, this does not show enough understanding of the group work that you carried out and this is because you have not considered the credits, editing, sounds, etc

    ReplyDelete